During a technical line review, a Field engineering team member noted a signal light being produced used a separate right and left side end cap. Both end caps physically fastened to either side of the signal light, but an extruded hole prevented this from being done.
Field reviewed the “where used” report on the customer’s computer system and found these extruded holes were part of a legacy option that was no longer offered to any of their customers. Therefore the holes were no longer necessary to the design.
This SKU reduction project eliminated the need to physically monitor the inventory level, manufacture the parts, inspect the parts, maintain the drawings and ERP data, fill the bins in the assembly cell and pull parts from the assembly bins.
This is just one of many examples that led to this customer receiving a PPV andVAVE cost savings because of Field Engineering Integration. From this engineering project and others, Field saved the customer throughout the year a total of $150,914 or 9.3% of spend