Case Studies

Challenge During an assembly line review with a potential customer, the Field team noticed that a considerable amount of meter boxes were being scrapped and removed each day. Upon further review of the assembly process, the team observed that the workers were having problems with tapped thread quality and recess damage.

Read More
Audit Customer Savings

Challenge During an internal lean audit at Field, a team member was reviewing the frequency of transactions associated with a small group of fasteners being used by one customer. The team member discovered the number of transactions was inconsistent with the value of the product. The customer was managing a Kanban program internally and was shipping low dollar items on a regular basis and ...

Read More

RETHINKING THE ROLE OF SUPPLIER TECHNICAL SUPPORT Challenge The Field Engineering team provides hundreds of line reviews, product tear downs, and other technical support services every year to identify cost savings for our customers. The challenge is getting the cost savings implemented because fastener/ fastening issues are generally a low priority.

Read More

Observations and Solutions During a technical line review of a customer’s facility, the Field team observed the components and methods of manufacturing used to assemble an engine. The following observations were made with corresponding solutions:

Read More

CROSS FUNCTIONAL TECHNICAL TRAINING BENEFITS CUSTOMER WITH A TOTAL SAVINGS OF $73,193 Observation and Solution Upon reviewing a customer’s request for a quote for new parts, a Field account manager discovered several parts being ordered had a special plating request. The plating requested was a high end organic finish that would provide a great resistance to corrosion, but would require multiple ...

Read More
Gear Box Pinion Nut Redesign

FIELD REDESIGN AND PROCUREMENT YIELDED $32,700 IN TOTAL SAVINGS Challenge The Field team initiated an engineering review of a customer’s product that revealed a problem they were having with a specific part. The machined part was subject to occasional cracking, due to the notch-sensitive nature of parts produced by the screw machining process. Part dimensions needed to be largely maintained due ...

Read More
Brass Insert Elimination

Challenge Field’s customer was facing strong cost pressures as the only domestic manufacturer of their electronic products. Based on recommendations from Field on similar products, the large number of brass inserts and machine screws were targeted for evaluation. The current injection molded parts were designed with 32 brass inserts in thread sizes from 2-56 up to 6-32.

Read More

Challenge During a plant Gemba Walk with a current customer, Field observed an assembly condition and took steps to perform an Applications Problem Solving and Assembly Line Review of their manufacturing process when applying tape to pipe plugs and pipe nipples.

Read More
KANBAN System

PART REDESIGN AND PROCUREMENT IMPROVEMENT YIELDS TOTAL SAVINGS OF $206,500 The Challenge During a technical line review of a customer’s facility, the Field team worked with the director of purchasing to identify cost-reduction opportunities among high-volume parts. One element in particular drew their attention: a stainless steel window hardware part.

Read More
Oscillating Tool Bearing Flange

FIELD INITIATED ENGINEERING REVIEW AND PRODUCT REDESIGN YIELDS $170,000 IN COST SAVINGS Challenge Field initiated an engineering review of a customer’s application that revealed a high-cost component, which required multiple assembly steps and created potential quality concerns. Field provided engineering resources to redesign a more cost-effective part that lowered component costs, assembly ...

Read More
product redesign

FIELD REDESIGNS TOOL, YIELDS $47,400 IN SAVINGS EQUATING TO 10X THE COST OF THE FASTENER Challenge Unaware of any immediate product improvement opportunities, the purchasing manager of a prospective Field customer led the Field team onto the manufacturing floor for a technical line review of the facility. Field immediately identified a significant cost-savings opportunity at the first work ...

Read More
Life Critical Glove Inflator Redesign

FASTENING REDESIGN YIELDS SAVINGS OF $44,470 MORE THAN 9X THE COST OF THE FASTENER Challenge A prospective customer approached the Field team with a request for a quote on a fastener.

Read More